Vertical Data Integration for Reactive Scheduling
Autor(en):
Zusammenfassung
Within supply chains planning and scheduling tasks are spread across several companies and over several hierarchically levels. But the main scheduling direction is top down which means that reactive scheduling in the case of disturbing events is not supported on all scheduling levels of the supply chain. To support a reactive scheduling process in the supply chain this paper presents a concept of vertical data integration using basic data from shop floor to generate events useful in scheduling decisions on higher levels.
- Vollständige Referenz
- BibTeX
Sauer, J.,
(2010).
Vertical Data Integration for Reactive Scheduling.
KI - Künstliche Intelligenz: Vol. 24, No. 2.
Springer.
(S. 123-129).
DOI: 10.1007/s13218-010-0025-3
@article{mci/Sauer2010,
author = {Sauer, Jürgen},
title = {Vertical Data Integration for Reactive Scheduling},
journal = {KI - Künstliche Intelligenz},
volume = {24},
number = {2},
year = {2010},
,
pages = { 123-129 } ,
doi = { 10.1007/s13218-010-0025-3 }
}
author = {Sauer, Jürgen},
title = {Vertical Data Integration for Reactive Scheduling},
journal = {KI - Künstliche Intelligenz},
volume = {24},
number = {2},
year = {2010},
,
pages = { 123-129 } ,
doi = { 10.1007/s13218-010-0025-3 }
}
Sollte hier kein Volltext (PDF) verlinkt sein, dann kann es sein, dass dieser aus verschiedenen Gruenden (z.B. Lizenzen oder Copyright) nur in einer anderen Digital Library verfuegbar ist. Versuchen Sie in diesem Fall einen Zugriff ueber die verlinkte DOI: 10.1007/s13218-010-0025-3
Haben Sie fehlerhafte Angaben entdeckt? Sagen Sie uns Bescheid: Feedback abschicken
Mehr Information
ISSN: 1610-1987
Datum: 2010
Typ: Text/Journal Article

