| dc.contributor.author | Jodlbauer, Herbert | |
| dc.contributor.author | Palmetshofer, Karl | |
| dc.contributor.author | Reitner, Sonja | |
| dc.date | 2005-04-01 | |
| dc.date.accessioned | 2018-01-16T08:53:01Z | |
| dc.date.available | 2018-01-16T08:53:01Z | |
| dc.date.issued | 2005 | |
| dc.identifier.issn | 1861-8936 | |
| dc.identifier.uri | http://dl.gi.de/handle/20.500.12116/12448 | |
| dc.description.abstract | Correct standard times are needed for logistic operating curves, manufacturing planning and control systems and Advanced Planning Systems (APS) for scheduling, lot-sizing and sequencing. This paper presents a model for calculation of standard times based on the knowledge of the total busy time of a work center and the produced number of items in a fixed time period. The developed method requires little effort in comparison to other methods such as Work-Factor or time observation. It can regularly determine standard times using current confirmation data. | |
| dc.publisher | Springer | |
| dc.relation.ispartof | Wirtschaftsinformatik: Vol. 47, No. 2 | |
| dc.relation.ispartofseries | Wirtschaftsinformatik | |
| dc.subject | Confirmation Data | |
| dc.subject | Constraint Scheduling | |
| dc.subject | Machine Utilization Time | |
| dc.subject | Repetitive Manufacturing | |
| dc.subject | Standard Times | |
| dc.title | Implizite Determinierung von Plan-Belegungszeiten | |
| dc.type | Text/Journal Article | |
| mci.reference.pages | 101-108 | |
| gi.identifier.doi | 10.1007/BF03250982 | |